Gabriela Tejada GuerreroGabriela has extensive expertise in international cooperation in education, research and innovation. She joined EPFL as scientist at the Cooperation and Development Center (CODEV) where she led the EPFL Leading House Program (2014-2017) of the Swiss government, which upheld Swiss bilateral research cooperation with Brazil, India, Vietnam and Latin America. Her research focused on scientific diasporas and skilled migration with diverse international collaborations under her leadership. She worked at the University of Zurich, and the UNDP in Moldova and Geneva, and taught at the Monterrey Institute of Technology (ITESM). She was visiting researcher at the CES at Harvard University and the CIS at ETH Zurich. Gabriela obtained a BA in International Relations from the UIA (Ibero) in Mexico, and a PhD in Political Sciences from the UAB in Barcelona. She obtained a CAS IPA - International Policy and Advocacy of the D-MTEC, ETH Zurich (2019). Since 2020 Gabriela is Vice-President of the Swiss Commission for UNESCO (member since 2016), where she promotes science-society linkages and advocates for an inclusive development and dialogue through education, science and culture.Since May 2019, Gabriela is Academic Deputy at the Direction of the College of Humanities (CDH). She serves the Scholars at Risk program (SAR) at EPFL in an advisory capacity.
Amela Groso2016 - Present: DSPS-Safety Competence Center, EPFL andISIC-Group of Chemical and Physical Safety2007 - 2016:Occupational Safety and Health at the Faculty of Basic Sciences, EPFL Education : 2004 - 2006 : Postdoctoral fellow at the beamline for Microtomography, Swiss Light Source, Paul Scherrer Institute (PSI), Switzerland 2000 - 2004: PhD student of Prof. Margaritondo G., Institut de physique de la matière complexe, EPFL, SwitzerlandPhD, physics 1997 - 2000: Holder of research fellowship for training on beamlines and experimental stations at the Elettra, Synchrotron Light Source, Trieste (Italy). 1991 - 1997: MSc in Physics, Physics department of the University of Sarajevo (Bosnia and Herzegovina)
Damir FilipovicDamir Filipovic holds the Swissquote Chair in Quantitative Finance and is Swiss Finance Institute Professor at the Ecole Polytechnique Fédérale de Lausanne (EPFL), Switzerland. Prior to this, he was head of the Vienna Institute of Finance and professor at the University of Vienna. He previously held the chair of financial and insurance mathematics at the University of Munich, and he was on the faculty of Princeton University. He received his Ph.D. in mathematics from ETH Zurich in 2000. Damir Filipovic worked as a scientific consultant for the Swiss Federal Office of Private Insurance from 2003 to 2004. There he co-developed the Swiss Solvency Test, which defines the regulatory capital requirement for all Swiss based insurance companies and groups. He is on the editorial board of several academic journals. His research interests include the term structure of interest rates, credit and volatility risk, quantitative methods in risk management, and stochastic processes. His papers have been published in a variety of academic journals including the Journal of Financial Economics, Mathematical Finance, Finance and Stochastics, and the Annals of Applied Probability. He is the author of a textbook titled Term-Structure Models.
Stéphanie LacourStéphanie P. Lacour holds the Bertarelli Foundation Chair in Neuroprosthetic Technology in the School of Engineering at EPFL and leads the Laboratory for Soft Bioelectronic Interfaces. She received her PhD in Electrical Engineering from INSA de Lyon, France, and completed postdoctoral research at Princeton University and the University of Cambridge. She is the recipient of the 2006 MIT TR35, a University Research Fellowship of the Royal Society, European Research Council ERC Starting and POC Grants, and a SNSF-ERC Consolidator Grant. She was elected a 2015 Young Global Leader by the World Economic Forum.
Kamiar AminianKamiar Aminian received the M.S. degree in electrical engineering in 1982, the Ph.D degree in biomedical engineering in 1989 and the Postgraduate degree on technical computing in 1993 from Ecole Polytechnique Fédérale de Lausanne (EPFL). He was assistant professor (1994-1996) with Sharif University of Technology (Tehran). He joint EPFL in 1996 where he is currently Professor of medical instrumentation and the director of the Laboratory of Movement Analysis and Measurement in the Institute of Bioengineering of EPFL. His research interests include methodologies for human movement monitoring and analysis in real world conditions mainly based on wearable technologies and inertial sensors with emphasis on gait, physical activity and sport. His research aims to perform outcome evaluation in orthopaedics, to improve motor function and intervention programs in aging and patients with movement disorders and pain, and to identify metrics of performance in sport science.
Kamiar Aminian is a member of the International Society of Posture and Gait Research, the Institute of Electrical and Electronics Engineers, the European Society of Movement Analysis in Adults and Children, the Prevention of fall Network Europe, the Intentional Society of Biomechanics and the President of the 3D analysis of the human movement group. He is author or co-author of more than 450 scientific papers published in reviewed journals and presented at international conferences and holds 10 patents related to medical devices.
Full CV
ORCID
Arnaud MagrezEducation
PhD., Materials Science, summa cum laude, Université de Nantes, 2002
M.S., Chemistry, Université des Sciences et Technologies de Lille, 1999
Academic positions
Head of the Crystal Growth Facility, EPFL, 2012-present
Research Associate, Laboratoire de Physique de la Matière Complexe, EPFL, 2003-2012
Research Fellow, Peter Grunberg Institute, FZ-Juelich, 2002-2003
Administrative positions at EPFL
Scientific staff member, EPFL Assembly, 2015-present
Scientific staff member, School Council SB, 2014-present
Member of the IPHYS office 2016-present
Member of the ICMP office 2012-2015
Member of the safety committee of ICMP 2010-2015
Eugen Brühwilerbirth date: 19.11.1958 nationality: Swiss (native from Dussnang, Canton of Thurgau) Education : - July 1988 : doctoral degree from the Swiss Federal Institute of Technology in Lausanne (EPFL), Switzerland with a thesis entitled Fracture mechanics of dam concrete subjected to quasi-static and seismic loading conditions - December 1983 : civil engineering diploma (university degree) from the Swiss Federal Institute of Technology (ETH) in Zurich, Switzerland Professional Experience : - Since 1st April 1995 : Professor of Structural Engineering at EPFL and Head of the Laboratory of Maintenance, Construction and Safety for Civil Structures (MCS) (often considered being the first chair worldwide devoted exclusively to existing civil structures). - 1991-94 Project Manager and structural engineer with the Swiss Federal Railways (SBB), Division of Bridges and Structures, Zurich: Monitoring and maintenance of bridges and structures, Project manager and checking engineer for the construction of new bridges and rehabilitation of existing bridges. - 1989/90 Research associate at the Department of Civil Engineering, University of Colorado, Boulder, USA : Fracture mechanics of concrete and fracture of concrete dams. - 1986-88 Doctoral student at EPFL-LMC (Building Materials, Prof. Wittmann) : Fracture mechanics of concrete, fracture of concrete dams under seismic loading - 1984/85 Research engineer at EPFL-ICOM (Steel Structures, Prof. Badoux and Prof. Hirt) : Fatigue behaviour and fracture mechanics of riveted bridges
Thierry MeyerThierry Meyer received in 1986 a diploma degree (MSc) in chemical engineering from the Swiss Federal Institute of Technology at Lausanne (EPFL). He was awarded in 1989 a PhD at EPFL for his thesis on micromixing in highly viscous polymeric media. He joined the Institute of Chemical Engineering from 1989 till 1993 as senior scientist in the field of polymerization reactions. In 1994 he joined Ciba-Geigy SA in the pigment division as successively development chemist, head of development a.i. and finally production manager for high performance pigments. Returning to the Institute of Chemical Engineering at EPFL in Lausanne by the end of 1998, he was nominated maître denseignement et de recherche (MER) for leading a new research group in the field of polymers and supercritical fluids, and teaching to chemists, chemical engineers and material sciences, disciplines as process development, introduction to chemical engineering, polymer and organic chemistry at master and bachelor program. In 2005 he owned the responsibility of the Occupational Health and Safety of the school of basic sciences on top of his research activities dealing with risk management and supercritical fluids. He is presently teaching introduction to chemical engineering at bachelor level, risk management at master level and specific courses on safety and engineering risk management in continuing education. He acts also as consultant and expert in risk assessment and chemical engineering matters by the ICC (International Chamber of Commerce) of the World Business Organization, by several consultancy companies and by major and SMEs chemical industries. Thierry Meyer is currently member of several international associations of the European Federation of Chemical Engineering, American institution of chemical engineering, American chemical society and senior member of the American Institute of Chemical Engineers. He was elected chairman of the European Working Party on Polymer Reaction Engineering from 2001 till 2006. He his currently the Swiss academic member of the European Working Party on Loss Prevention and Safety Promotion as well as of the European Working Party on Education. He is member of several editorial boards: Chemical Engineering Research and Design, Macromolecular Reaction Engineering, Chemical Engineering and Technology, Journal of Chemical Health and Safety.
Dimitrios LignosProf. Lignos joined the École Polytechnique Féderale de Lausanne (EPFL) in 2016 from McGill University in Canada where he was a tenured Associate Professor and a William Dawson Scholar for Infrastructure Resilience. He holds a diploma (National Technical University of Athens, NTUA, 2003), M.S. (Stanford University, 2004) and Ph.D. (Stanford University, 2008). In addition, he was a post-doctoral scientist at Stanford University (2009) and in Kyoto University (2010). Prof. Lignos teaches graduate and undergraduate courses in seismic design, nonlinear behaviour of steel and composite structures as well as supplemental damping systems, Structural Stability, Nonlinear Analysis and Performance-based Earthquake Engineering. His awards for teaching, research and service in Civil Engineering include the 2011 Outstanding Teaching Award (Faculty of Engineering, McGill University), as well as the Outstanding reviewer (2012, 2013) award from ASCE, the 2013 State-of-the-Art in Civil Engineering Award by ASCE and the 2014 Christophe Pierre Award for Research Excellence - Early Career. Just recently, he received the 2019 Walter L. Huber Civil Engineering Research Prize from ASCE for significant contributions in developing state of the art methods to simulate extreme limit states in steel structures.Prof. Lignos is a member of ASCE and the Earthquake Engineering Research Institute. He acts as an Associate Editor for Metal Structures and Seismic Effects of the ASCE Journal of Structural Engineering. He joined the Editorial Board of Earthquake Spectra and Earthquake Engineering and Structural Dynamics International journals. He serves as an acting member of the CEN/TC 250/SC 8/WG 2 and has been selected as a member of the Project Team (PT2) for the Eurocode 8-Part 1 Current Revisions for Steel and Composite Structures. He is also a member of the Canadian Standards Association (CSA) S16 technical committee for Steel Structures. Prof. Lignos is involved as a NEHRP consultant in numerous research-to-practice projects related to the behaviour and nonlinear modelling and analysis of structures applicable to the engineering practice through the Applied Technology Council (ATC). Detailed Curriculum Vitae (last update September 2018)