ScheduleA schedule or a timetable, as a basic time-management tool, consists of a list of times at which possible tasks, events, or actions are intended to take place, or of a sequence of events in the chronological order in which such things are intended to take place. The process of creating a schedule — deciding how to order these tasks and how to commit resources between the variety of possible tasks — is called scheduling, and a person responsible for making a particular schedule may be called a scheduler.
Scheduling (production processes)Scheduling is the process of arranging, controlling and optimizing work and workloads in a production process or manufacturing process. Scheduling is used to allocate plant and machinery resources, plan human resources, plan production processes and purchase materials. It is an important tool for manufacturing and engineering, where it can have a major impact on the productivity of a process. In manufacturing, the purpose of scheduling is to keep due dates of customers and then minimize the production time and costs, by telling a production facility when to make, with which staff, and on which equipment.
Gestion de projetLa gestion de projet, est l'ensemble des activités visant à organiser le bon déroulement d’un projet et à en atteindre les objectifs en temps et en heures selon les objectifs visés. Elle consiste à appliquer les méthodes, techniques, et outils de gestion spécifiques aux différentes étapes du projet, de l'évaluation de l'opportunité jusqu'à l'achèvement du projet. Cette activité porte également le nom de conduite de projet, pilotage de projet, ingénierie de projet, ou encore management de projet.
Chemin critiqueDans un problème d'ordonnancement en informatique théorique, ou en gestion de projet, un chemin critique désigne la (ou les) liste(s) ordonnée(s) des opérations nécessaires pour obtenir le résultat voulu, dont la durée totale donne la durée du projet. C'est donc aussi, parmi les différents chemins constitués par les tâches (ordonnées selon la nécessité du projet), le (les) plus long(s) chemin(s) obtenu(s) ; il y a deux chemins critiques lorsque les deux listes de tâches correspondantes qui sont prévues demandent la même durée.
Logiciel de gestion de projetsLes logiciels de gestion de projets sont des logiciels ayant pour objectif de faciliter le travail de gestion de projet. Le travail des logiciels de gestion de projet est généralement d'automatiser des tâches de sauvegarde et/ou de la gestion du temps. Par exemple, les systèmes de gestion de versions, ou les systèmes de gestion de configuration enregistrent différents états d'un projet et gardent une trace de la date de modification.
Organigramme des tâches du projetUn organigramme des tâches du projet (OTP) ou structure de découpage du projet (SDP), ou encore work breakdown structure (WBS) (en anglais), est une décomposition hiérarchique des travaux nécessaires pour réaliser les objectifs d'un projet. Elle a pour but d’aider à organiser le projet, en définissant la totalité de son contenu et en servant de référence pour planifier les activités et établir le budget prévisionnel. Elle est également utilisée pour guider la gestion des risques, ou identifier les acquisitions nécessaires.
Urbanismevignette|upright=1.0|Gratte-ciel vus depuis la tour CN à Toronto (Canada). vignette|upright=1.0|Vue d'un quartier de Pachuca (Mexique). L'urbanisme est l'ensemble des sciences, des techniques et des arts relatifs à l'organisation et à l'aménagement des espaces urbains. Ce projet peut être sous-tendu par une volonté d'assurer le bien-être de l'homme et d'améliorer les rapports sociaux en préservant l'environnement. Les professionnels qui exercent ce métier sont des urbanistes.
Structure de décomposition du produitLa structure de décomposition du produit (SDP), ou organigramme technique de produit (OTP), ou encore product breakdown structure (PBS) (en anglais) est en gestion de projet la décomposition hiérarchique des produits à réaliser lors d'un projet. Cette décomposition fournit une liste exhaustive et hiérarchisée (sous forme d’organigramme en arbre) du produit final et des produits intermédiaires qui le composent. Cet outil est utilisé pour la technique de planification de projets basée sur les produits (ou livrables).
Microsoft ProjectMicrosoft Project (ou MS Project ou MSP) est un logiciel de gestion de projets édité par Microsoft. Il permet aux chefs de projet et aux planificateurs de planifier et piloter les projets, de gérer les ressources et le budget, ainsi que d'analyser et communiquer les données des projets. Utilisé aujourd'hui (2011) par plus de 20 millions de chefs de projet, Microsoft Project est le logiciel de gestion de projet le plus utilisé au monde. Plus de entreprises ont aussi déployé la version serveur de Microsoft Project, nommée Microsoft Project Server.
PERTPERT (en anglais : program evaluation and review technique) est une méthode conventionnelle utilisable en gestion de projet, ordonnancement et planification développée aux États-Unis par la Navy dans les années 1950. Elle fournit une méthode et des moyens pratiques pour décrire, représenter, analyser et suivre de manière logique les et le réseau des tâches à réaliser dans le cadre d'une action à entreprendre ou à suivre. Le diagramme PERT représente le planning des travaux par un graphe de dépendances.
Allocation des ressourcesL'allocation des ressources est un concept économique qui concerne l'utilisation des ressources rares et notamment les facteurs de production (travail, capital, matières premières) pour satisfaire à court et long terme les besoins de consommation de la population. Cette allocation sert également à financer des services non marchands comme la justice, la police, certaines infrastructures communes (voirie...) indispensables au fonctionnement de la société.
Schedule (project management)In project management, a schedule is a listing of a project's milestones, activities, and deliverables. Usually dependencies and resources are defined for each task, then start and finish dates are estimated from the resource allocation, budget, task duration, and scheduled events. A schedule is commonly used in the project planning and project portfolio management parts of project management. Elements on a schedule may be closely related to the work breakdown structure (WBS) terminal elements, the Statement of work, or a Contract Data Requirements List.
Theories of urban planningPlanning theory is the body of scientific concepts, definitions, behavioral relationships, and assumptions that define the body of knowledge of urban planning. There are nine procedural theories of planning that remain the principal theories of planning procedure today: the Rational-Comprehensive approach, the Incremental approach, the Transformative Incremental (TI) approach, the Transactive approach, the Communicative approach, the Advocacy approach, the Equity approach, the Radical approach, and the Humanist or Phenomenological approach.
Critical juncture theoryCritical juncture theory focuses on critical junctures, i.e., large, rapid, discontinuous changes, and the long-term causal effect or historical legacy of these changes. Critical junctures are turning points that alter the course of evolution of some entity (e.g., a species, a society). Critical juncture theory seeks to explain both (1) the historical origin and maintenance of social order, and (2) the occurrence of social change through sudden, big leaps. Critical juncture theory is not a general theory of social order and change.
Dépendance au sentierLa dépendance au sentier, parfois appelé sentier de dépendance ou dépendance au chemin emprunté (path dependence ou path dependency en anglais), est un concept issu de la science économique qui s'est ensuite diffusé à la science politique et à la géographie économique. C'est un concept répandu en sciences économiques et sciences sociales pour étudier la diffusion de l'innovation et les questions de développement. La dépendance au sentier est souvent complétée par la notion d'effet de verrouillage (lock-in effect en anglais).
Réseau informatiquethumb|upright|Connecteurs RJ-45 servant à la connexion des réseaux informatiques via Ethernet. thumb|upright Un réseau informatique ( ou DCN) est un ensemble d'équipements reliés entre eux pour échanger des informations. Par analogie avec un (un réseau est un « petit rets », c'est-à-dire un petit filet), on appelle nœud l'extrémité d'une connexion, qui peut être une intersection de plusieurs connexions ou équipements (un ordinateur, un routeur, un concentrateur, un commutateur).
Constraint satisfactionIn artificial intelligence and operations research, constraint satisfaction is the process of finding a solution through a set of constraints that impose conditions that the variables must satisfy. A solution is therefore a set of values for the variables that satisfies all constraints—that is, a point in the feasible region. The techniques used in constraint satisfaction depend on the kind of constraints being considered.
Network planning and designNetwork planning and design is an iterative process, encompassing topological design, network-synthesis, and network-realization, and is aimed at ensuring that a new telecommunications network or service meets the needs of the subscriber and operator. The process can be tailored according to each new network or service. A traditional network planning methodology in the context of business decisions involves five layers of planning, namely: need assessment and resource assessment short-term network planning IT resource long-term and medium-term network planning operations and maintenance.
Chef de projetLe chef de projet (CDP) est la personne chargée de mener un projet et de gérer son bon déroulement. De manière générale, sans être systématique, il anime une équipe pendant la durée du ou des projet(s) dont il a la charge. D'autres appellations existent pour ce type de poste (chargé/coordonnateur/responsable/gestionnaire/administrateur/directeur, etc.) et varient en fonction de l'organisation et de la taille de l'entreprise de travail.