Ask any question about EPFL courses, lectures, exercises, research, news, etc. or try the example questions below.
DISCLAIMER: The Graph Chatbot is not programmed to provide explicit or categorical answers to your questions. Rather, it transforms your questions into API requests that are distributed across the various IT services officially administered by EPFL. Its purpose is solely to collect and recommend relevant references to content that you can explore to help you answer your questions.
This report documents the technical continuation of P. Tessier's semester project [1] on the integration of fast neutron reactors (FNR) and nuclear fusion into the Swiss 2050 energy mix, modelled with the EnergyScope optimisation framework [2]. Two extensions are presented. First, the underlying model is ported from EnergyScope's monthly-resolution formulation to the hourly, typical-days (TD) formulation of EnergyScope TD, addressing a limitation explicitly identified at the end of the original project. The transition requires re-expressing all nuclear capacity-factor profiles at hourly granularity, introducing explicit baseload constraints for each reactor technology, and translating the renewable-generation bounds and the operational GWP ceiling (4,200 ktCO2-eq/y, sourced from the Swiss Federal Perspectives Énergétiques 2050) into the same hourly summation form. Second, the nuclear fuel-cycle representation is extended beyond a single lumped waste stream: interim storage, reprocessing (with recovery of uranium, plutonium and vitrified high-activity waste), MOX fabrication and long-term geological disposal are introduced as distinct technologies, each parametrised and sourced from institutional references (swissnuclear/Nagra, ZWILAG, Orano, the World Nuclear Association, and the INL Advanced Fuel Cycle Cost Basis). A unit ambiguity in Tessier's model-the conflation of an energy ratio (2.7027 GWh th /GWh elec) with a mass in kg/GWh elec-is identified and corrected, yielding a revised spent-fuel output coefficient of 3.3858 kg/GWh elec that anchors the downstream mass balance. Together, these extensions track Switzerland's projected spentfuel stock-2,960,000 kg of heavy metal, corresponding to lifetime reactor production minus material already reprocessed abroad-through to its possible end states, whether direct geological disposal or reprocessing and partial reuse as FNR fuel. This report is intended as a technical and methodological reference: it documents what was modelled, how, and on what basis, rather than presenting a scenario analysis, which is left as a natural next step for future work.