Ask any question about EPFL courses, lectures, exercises, research, news, etc. or try the example questions below.
DISCLAIMER: The Graph Chatbot is not programmed to provide explicit or categorical answers to your questions. Rather, it transforms your questions into API requests that are distributed across the various IT services officially administered by EPFL. Its purpose is solely to collect and recommend relevant references to content that you can explore to help you answer your questions.
This work describes a development of a control system and control strategies capable of governing multiple flexible AC transmission system (FACTS) devices. The main purposes of the presented coordinated control system are to remove overloads and to achieve specified power flows in transmission lines of a power system in the normal and N-1 steady-state operational modes. Proposed control strategies are based on heuristic rules; therefore they do not require intensive computations. A prototype of a control system has been designed as a real time tool constantly monitoring power flows and generating appropriate control signals to each FACTS device in order to maintain acceptable power flow levels. It has been interfaced with load flow software to test its effectiveness through non-linear simulations using the 380/220 kV Swiss power system as the study case. The results obtained are presented