Lecture
Mediaspace scheduled maintenance: Aug 25, 2026 07:00 - 12:00 AM. During this time, videos will be temporarily unavailable. Check status updates.
This lecture covers the step-by-step process of installing ElastoTop® EPDM membrane, including laying out the membrane, applying adhesive, folding edges, spreading glue, pressing and smoothing the membrane, and bonding the edges.